When installed asphalt plant, but also to do all sensors shielded wire grounded reliable, the ground can link the ground deflectors of control unit, but the ground is different from the previously mentioned protective ground point and anti- Ray grounding point, leaving this ground to protect the ground at least 5m away from the straight line, grounding resistance is not greater than 4Ω.
2, do well the commissioning work carefully
When asphalt plant initial assembly, commissioning work may need to spend a lot of energy and time, as may be found in debugging a lot of problems, such as wiring errors, component or control unit parameter setting is inappropriate, improper installation location component, component damage, etc. reasons, specifically what is the reason, it is necessary to correct or adjust in accordance with the drawings, the actual situation and the test results.
After asphalt plant main part and electrical system installed, to do serious debugging work, starting with a single action manually controlled single motor load commission, if have problem do check the line and electrical components whether or not normal, if a single action single motor test action are normal, you can enter part of the unit controlled manually or automatically load commission, if are normal, then enter the full automatic load test. after work done, then do the whole machine with load test machine. after completed commissioning work, it can be said that the basic asphalt plant installation work has been completed, asphalt plant has already have a production capacity.
3, do well done temperature regulation of control room, often cleaning electrical components and external unit dust, check electrical components frequently, and do well done the maintenance work of mechanical transmission part.
The control room of asphalt plant is the electric control syltem core, if the control room temperature is too high, it will affect the electrical components and systems normal work reliably, so to adjust the control room temperature. Since the largerdust of field, which have a greater impact with relays, contactors and other electrical components work reliably, so regular cleaning dust from various parts of the electrical components. In order to make the various mechanical transmission of asphalt plant can operate normally, to timely manner lubrication of mechanical transmission part.