Asphalt hot mix plant conposed by cold material supply system, drying rollers, asphalt supply system, etc., and now we are mainly introduce the cold material tooling systems.Four sets Cold hopper: vibrator: CZ600; vibration force 6000N 0.15KW, The unit composed by six square taper cold silos (each with a capacity 11.5m3), six inverter chain plate and two aggregate batching machine belt machine. Cold silo discharge ports are trapezoidal, to facilitate the discharge. Length 3600mm × 2500mm, spout height adjustable, width 400mm. Fine silo set vibrating motor in order desorption, and broken arch; the batching machine applied variable speed machine, controlled by control room, in order to adjust the drag plate operating speed, can be twist-site discharge door height adjustment screw together to achieve regulating coarse-graded. Aggregate belt conveyor width is 700mm, belt speed is 2m / s, because of the wide belt and high belt speed achieve a higher productivity effect with lighter structure. In order to eliminate gauge cold material, the cold hoppers are equipped with iron grate catchy achieve isolation.
Feeding hopper: The type: Chain slat; Six sets Power:YCT160B 3.0KW; Six sets Inverter: EV1000-4T0037G, Batching machine drag plate and aggregates elastic belt tension adjusted by screwing each frame to achieve the adjustment screw.Aggregate belt: production capacity: 350t / h; 2 sets electric drum: TJ315-5.5-200-800.Simple shaker: Power: vibration motor VB-1076-W 0.75KW; exciting force: max 10000N. small, simple shaker composed by a vibrating motor, screen, rack, vibration isolation springs and other components to remove super-size cold aggregate. Hopper and simple shaker struck out super-size cold aggregate, the scene cleared by hand. Belt conveyor (inclined belt): transmission capacity: 350t / h; Conveyor Height: 4.9m; Belt speed: 2m / s; Bandwidth: 800mm; Power: electric drum TJ315-4.0-200-900 (4KW). Belt conveyor mainly composed frame body, retaining hopper, electric rollers, idler pulley, grooved roller, lower parallel rollers, belts and other components. It sent the coarse gradation cold aggregate which from aggregate transports, the ramp into the drying drum. adjustment of the inclined belt tension adjusting the shelves by the twist screw to achieve.Zhengzhou Dayu Machinery Co., Ltd. is one leading supplier in road construction machinery industry in China, who is belong to LiaoYuan Grou. LiaoYuan Group was established in September 1992, Headquarters is located at Henan Province, China.
The overall layout and processes of the complete asphalt batching plant composed by cold material supply system(including cold hoppers,batching machines and aggregates conveyance fale belt), belt conveyor,drying drum, hot material hoist, mixing floor(including shaker,hot hopper,metering devices, mixing tanks) and the supply powder devices(including bunker,screw conveyor, powder hoist, etc.) and dust removal device, asphalt supply system, oil furnace, air compressor, control room and other components. The asphalt batching plants main layout devided by production process and use of field conditions. Usually in the form of the diagram,facilitate the production and transport and to achieve compact layout and orderly. To reduce the footprint, cold grading unit and belt conveyor into a "T" shaped layout.the central of the asphalt batching plant and the top of the finished products warehouse setting a camera, for the scene , especially cold material part of the operate and upgrade bucket haul situation to monitor in the operating room at a glance.
The main process of asphalt plantsix cold hopper completed several gravel cold aggregate storage, exile to six feeder, complete primary distribution, several materials mixed together by belt feeder set to pass the belt conveyor and then into the drying drum.the hot material after dry heated sent to vibrating screening machines by hot material hoist, the obtained different particle size ranges hot material by screening were slassified into five hot material silo, super granularity hot material discharged the silo. by each hot material silo feeding measurement scales were accumulated weighed gravel hot material, according to the proportion to achieve fine gradation.Powder and asphalt were treated weighed in proportion to join, well mixed by a mixer lorry transport to the finished product storage silos, storage pending Sinotrans use.If you are interesting our product, click here to visit our website, and enqury to us, our email address is machine@dayucn.biz.
DAYU LB4000 Forced batch asphalt batching plant, the use and features of this equipment:We produced the LB4000 products, summarize years of development and production experience, learn the advantages of similar products at home and abroad, in the premise of increase the technological content and performance, and fully meet the user requirements, to design, research, development and production. It is mainly used for road especially highway, airport, wharf construction of asphalt mixing operations. The equipment structure is advanced design and reasonable, machine performance is stable and reliable, the core system with IPC and the programmable controller, you can easily achieve automatic control of the production process. Well-designed heating and insulation measures for the control of dust floating more so this device has a distinct energy saving, environmental protection and other features.Complete equipment using vacuum sand-blasting technology and the outer inlay color plates, reasonable colors, with good visual effect. Equipment has been well received by the user after going into production.Key performance indicatorsProductivity: 320 ~ 350t / h; per cylinder Capacity: 4000kg / cylinder; total installed capacity: 20KW;Fuel consumption: ≤ 6.9kg / t; mixture temperature: 130 ~ 170 ℃; dust emission concentration: 34.5mg/Nm3; operators ear edge noise: 69.0dB (A); finished goods storage bin capacity: 200t; total area: 2500m2.DAYU Asphalt-plant is one leading supplier in road construction machinery industry in China, who is belong to LiaoYuan Group, LiaoYuan Group was established in September 1992, Headquarters is located at Henan Province, China. Dayu is asphalt plant manufacturer, asphalt plant for sale, if you are interesting our plant, please send us email machine@dayucn.biz .
Asphalt mixing plant maintenance time requirements : 1, routine maintenance; 2, after asphalt mixing plant worked 1000 hours, should be once a small repaired for mechanical, electrical systems; 3, after asphalt mixing plant wordke 4000 hours, should be once a medium repaired for mechanical, electrical systems; 4, after asphalt mixing plant worked 8000 hours, shoule be once a big repaired for mechanical, electrical system. Preparatory work before disassembled: 1, asphalt mixing plant 2 drivers, 4 mechanics, 1 electricians, 2 commanders, a 20 tons tire crane;2, two 8lbs hammers, 4 Standard special wrench, a 375 and 450 movable wrench, a set of electrical tool, two belts, buckles hoisting rope, wire, sleepers and other commonly used tools. 3, around the asphalt mixing plant should be no debris and obstructions. demolition steps: In working procedures the disassembly and installation of asphalt mixing plant are contrary, that is the last installed part fist taken part, first installed last taken part, in the demolition process must not be careless , to prevent accidents , car crane disassembly of this project parked on flat ground, and used skid pad level.make the system disconnect the power, remove the screw that standard section parts connected, then hanged one bye one accroding to the order; Not simultaneously loosened up and down two screw or while mobilizing two screw,Such has been the standard hanging to the ground one by one.Demolition construction safety measures: 1, Removal asphalt mixing plant must be in order and have someone conductor. 2, the demolition process aerial operator should wear helmets and seat belts, the ground staff should wear helmets. 3, when demolited the asphalt mixing plant the wind should be less than four level. 4, the workspace is strictly prohibited non-working personnel.DAYU Asphalt-plant is one leading supplier in road construction machinery industry in China, who is belong to LiaoYuan Group, LiaoYuan Group was established in September 1992, Headquarters is located at Henan Province, China. Dayu is asphalt plant manufacturer, asphalt plants for sale, if you are interesting our plant, please send us email machine@dayucn.biz .
Asphalt mixing plant maintenance time requirements :
1, routine maintenance;
2, after asphalt mixing plant worked 1000 hours, should be once a small repaired for mechanical, electrical systems;
3, after asphalt mixing plant wordke 4000 hours, should be once a medium repaired for mechanical, electrical systems;
4, after asphalt mixing plant worked 8000 hours, shoule be once a big repaired for mechanical, electrical system.
Preparatory work before disassembled:
1, asphalt mixing plant 2 drivers, 4 mechanics, 1 electricians, 2 commanders, a 20 tons tire crane;
2, two 8lbs hammers, 4 Standard special wrench, a 375 and 450 movable wrench, a set of electrical tool, two belts, buckles hoisting rope, wire, sleepers and other commonly used tools.
3, around the asphalt mixing plant should be no debris and obstructions.
demolition steps:
In working procedures the disassembly and installation of asphalt mixing plant are contrary, that is the last installed part fist taken part, first installed last taken part, in the demolition process must not be careless , to prevent accidents , car crane disassembly of this project parked on flat ground, and used skid pad level.
make the system disconnect the power, remove the screw that standard section parts connected, then hanged one bye one accroding to the order; Not simultaneously loosened up and down two screw or while mobilizing two screw,Such has been the standard hanging to the ground one by one.
Demolition construction safety measures:
1, Removal asphalt mixing plant must be in order and have someone conductor.
2, the demolition process aerial operator should wear helmets and seat belts, the ground staff should wear helmets.
3, when demolited the asphalt mixing plant the wind should be less than four level.
4, the workspace is strictly prohibited non-working personnel.
DAYU Asphalt-plant is one leading supplier in road construction machinery industry in China, who is belong to LiaoYuan Group, LiaoYuan Group was established in September 1992, Headquarters is located at Henan Province, China. Dayu is asphalt plant manufacturer, asphalt plants for sale, if you are interesting our plant, please send us email machine@dayucn.biz .
1, Make well the electrical system ground ( or receive zero ) protection, and make well the whole machine lightning protection grounding and sensor shield grounding, from the power supply, if the power supply using the TT system, When installed the asphalt plant,the metal frame and control room's Electrical cabinet shell of asphalt plant are doing grounding protection. If the power supply using the TN-C system, when installed asphalt plant, the metal frame and control room's electrical cabinet shell of asphalt mixing plant should do grounding protection and access to zero reliable, this way not only achieve a asphalt plant conductive framework protect access to zero, but also to achieve a asphalt plant repeated electrical system neutral grounding. If the power supply with TN-S ( or TN-CS) system, when we installed asphalt batching plant, grounding and access to zero metal frame and control room's electrical cabinet of asphalt batching plants. Regardless of the kind of power supply system , do the grounding resistance of grounding point that is greater than 4Ω. In order to prevent asphalt plant lightning hazards, when installed asphalt plant, must be installed lightning rod in the highest point of asphalt plant, and all parts of asphalt plant must be in the effective lightning rod protection zone. the Lightning rod ground deflectors must be adopt a cross-section of not less than 16mm2, When installed asphalt plant must be have insulation protection, Copper skin, ground stations to be set up in other ground from asphalt plant at least 20m away where no pedestrian or facilities, and to ensure this grounding grounding resistance 30Ω or less.When installed asphalt plant, but also to do all sensors shielded wire grounded reliable, the ground can link the ground deflectors of control unit, but the ground is different from the previously mentioned protective ground point and anti- Ray grounding point, leaving this ground to protect the ground at least 5m away from the straight line, grounding resistance is not greater than 4Ω.
2, do well the commissioning work carefullyWhen asphalt plant initial assembly, commissioning work may need to spend a lot of energy and time, as may be found in debugging a lot of problems, such as wiring errors, component or control unit parameter setting is inappropriate, improper installation location component, component damage, etc. reasons, specifically what is the reason, it is necessary to correct or adjust in accordance with the drawings, the actual situation and the test results.After asphalt plant main part and electrical system installed, to do serious debugging work, starting with a single action manually controlled single motor load commission, if have problem do check the line and electrical components whether or not normal, if a single action single motor test action are normal, you can enter part of the unit controlled manually or automatically load commission, if are normal, then enter the full automatic load test. after work done, then do the whole machine with load test machine. after completed commissioning work, it can be said that the basic asphalt plant installation work has been completed, asphalt plant has already have a production capacity.3, do well done temperature regulation of control room, often cleaning electrical components and external unit dust, check electrical components frequently, and do well done the maintenance work of mechanical transmission part. The control room of asphalt plant is the electric control syltem core, if the control room temperature is too high, it will affect the electrical components and systems normal work reliably, so to adjust the control room temperature. Since the largerdust of field, which have a greater impact with relays, contactors and other electrical components work reliably, so regular cleaning dust from various parts of the electrical components. In order to make the various mechanical transmission of asphalt plant can operate normally, to timely manner lubrication of mechanical transmission part.
Asphalt concrete mixing plant is an important road construction equipment, it combines the mechanical, electrical and automation and many other technologies. Asphalt plants installation mainly includes base production, machine metal structure installation, installation and commissioning of electrical systems, asphalt heating and piping part of the installation. in the conditions of asphalt plant foundation built, the installation of mechanical metal structures can step in place, rarely make adjustments and changes in the future production. Asphalt heating and piping parts mainly for asphalt heating installation service, installation workload depends on bitumen storage and heating equipment . In production, the electric drive and control system weather or reliable is one important factor of affecting the asphalt plants normal production.
Installation and maintenance of asphalt plants electrical control system:1, familiar with the system, familiar with the principles, rational layout, make wiring connection Either asphalt plant is first installed or moved to a new site installation, The technical aspects of electrical installation and maintenance personnel should first familiar with the whole electrical system control mode and principles according to asphalt plant working process, familiar with the system distribution and some of the key control device specific role, so installation is relatively easy. by the peripheral portion to the each control unit or the external to control room concentration, and Cable arrangement should choose the right path, and requires the weak and strong signal cable distribution cable slot arrangement. The electrical system of the asphalt mixing plant includes strong electric, weak electric, AC, DC, digital signals, analog signals, to ensure these signals are effective and reliable transmission, make control unit and electrical components output the correct control signal timely, and can reliably drive the actuators, connection of electrical wiring reliability has played a significant impact. Therefore, during installation must be done at the connection of the wiring and electrical components installed reliable fastening. Asphalt plant mainly control units generally adopt IPC or PLC (programmable logic controller ), and their internal control processes are basically that after Internal circuit detects satisfy certain electrical input signal of logic relationship, output electrical signal timely that meet certain logical relationships to drive relays or other electrical units or components. these relatively sophisticated parts work is usually relatively reliable, if the operation or debugging fails, firstly check all the relevant input signal is or not input to the bit, then check the output signal of the outgoing inspection requirements are or not, whether according to the logic required output. Generally, as long as the input signal is valid and reliable to meet logic requirements, the output signal will be output in accordance with design requirements of internal procedures, unless wiring head (connection flapper ) loose or these control units with associated peripheral components and a fault line. Of course, individual special circumstances may also occur inside unit component damage or a circuit board failure.Now I supply a DAYU asphalt plant installation sample in algeria, if you interest it, you can click the link: www.asphalt-plant.cn/company-news/43-dayu-brand-asphalt-plant-succesful-installation-in-algeria.html.